Fire Station 204
Ingrid Tubon
Document Type
Student Work
Publication Date
6-27-2020
Keywords
architectural technology, schematic design, renovation, plan drawing, adaptive reuse, building science, studio 6
Design Concept
We operate on a systematic approach and processes repeated everyday. Especially for firefighters who respond to dangerous situations 24/7. For such a dynamic yet systematized nature of their work, understanding their routine and the toxins they are exposed to guided my design proposal for the current fire station. I implemented a straightforward approach towards placement of rooms and redesigned interior spaces that identifies with each company using the facility. To complement the design, I incorporated a striking red colour not only to designate spaces but also, add playfulness in and out of the building.
Faculty
Faculty of Applied Science & Technology (FAST)
Copyright
© Ingrid Tubon
Terms of Use
Terms of Use for Works posted in SOURCE.
Creative Commons License
This work is licensed under a Creative Commons Attribution-Noncommercial-No Derivative Works 4.0 License.
Original Publication Citation
Tubon, I. (2020, June, 27). Brampton fire station 204. Studio 6 summer 2020. https://perma.cc/H55E-Q82A
SOURCE Citation
Tubon, Ingrid, "Ingrid Tubon" (2020). Fire Station 204. 17.
https://source.sheridancollege.ca/student_work_fast_projects_studio6_fire_station204/17