Design Concept
For my design my focus was to be conscious of the cost and utilize as much the existing building as possible. I limited the amount of plumbing fixture relocation and did a small ground floor bump out to provide an immediate decontamination area off the apparatus bay and separate the two companies of fire fighters. The office areas were reconfigured to allow the chiefs to have better sleeping areas and a small update to the day room was done. The exterior was than updated to give the fire station a more modern look.
Faculty
Faculty of Applied Science & Technology (FAST)
Copyright
© Kyle Sweet
Terms of Use
Terms of Use for Works posted in SOURCE.
Creative Commons License
This work is licensed under a Creative Commons Attribution-Noncommercial-No Derivative Works 4.0 License.
Original Publication Citation
Sweet, K. (2020, June, 27). Brampton fire station 204. Studio 6 summer 2020. https://perma.cc/JT4U-YPGL
SOURCE Citation
Sweet, Kyle, "Kyle Sweet" (2020). Fire Station 204. 20.
https://source.sheridancollege.ca/student_work_fast_projects_studio6_fire_station204/20