Fire Station 204

Michael Chen

Streaming Media

Document Type

Student Work

Publication Date

6-26-2020

Keywords

architectural technology, schematic design, renovation, plan drawing, adaptive reuse, building science, studio 6

Design Concept

The idea behind my design is mainly focused on modernizing the structure by using more modern-day construction, design and Eco-friendly materials. The strategy is to make use of much of the existing footprint of the structure as possible, while minimizing the need to expand, reducing costs and materials needed. Such strategies include redesigning layouts and minimizing unused or unneeded spaces. As for health and safety, areas such as a decontamination shower has be included as well as enclosed spaces making it harder for contaminants to reach more vulnerable areas.

Faculty

Faculty of Applied Science & Technology (FAST)

Terms of Use

Terms of Use for Works posted in SOURCE.

Creative Commons License

Creative Commons Attribution-Noncommercial-No Derivative Works 4.0 License
This work is licensed under a Creative Commons Attribution-Noncommercial-No Derivative Works 4.0 License.

Original Publication Citation

Chen, M. (2020, June, 26). Brampton fire station 204. Studio 6 summer 2020. https://perma.cc/3SY7-E7GK

Share

COinS